Changzhou Zhongbang Chemical Group Co., Ltd.

home products Paints & Coatings Antistatic Industrial Floor Paint, ZBH-4

Antistatic Industrial Floor Paint, ZBH-4

Product Details:

Storage 12 Months
Water Resistance 24h, no change
Drying Time surface, no more than 4hours
Brand Name Zhongbang
heat resistance 150 degree 2h No change
Adhesion 1 grade
Storage Period 12 months
Water resistance dip in 7 d No change
10% vitriol resistance 56d No change
10% NaOH resistance 56d No change
Low Temperature Resistance -40 Degree
Place of Origin Jiangsu, China
Brand Name Zhongbang
Model Number ZBH-4

Payment & Shipping Terms:

Minimum Order Quantity: 1 Ton
Delivery Time: 25 days
Payment Terms: L/C,T/T,T/T, L/C at sight
Supply Ability: 100 Ton per Month

Detailed Product Description


Feature of floor paint:

1.Flatness without cleft, strong and solid

2.anti-break and pressure resistance

3.tough and abrasive resistance

4.excellent resistance for chemical drug, water, oil, solvent, and good anti-rust, quietly elegant

appearance

5.stepped comfort,once film forming is thickness, good streaming

6.without poison, accord with the request of green environment.

 

Method of construction:

 

1. The surface of glass roots should be no oil, dust, sundries and in time besmeared close primer in the surface of concrete that is disposed, in order to prevent the second pollution.

2. After mix round adequately according to proportion, lacquer and solidified solvent should be abducted 20~30 minutes, use it as soon as possible, and use this confected paint in 3 hours is the best.

3. When constructing primer and interim paint, we should put anti-grind material that is accorded to proportion in mixed paint. After use manual machine mill uniformly, and paint cloth with the method of shaving and paint. Primer and interim paint (mix) : primer that is accorded to the rate of anti-grand filler =100 : 350~400(the rate of weight). Interim = 100 : 200~250(the rate  of weight)

4. For applying cover, unfelt surface should be ground into flat, when construction, it need to push flat by tools, then the paint will automatic flow.

5. New ground cultivated time over 30 days. Water content is below 8% for applying.

6. Applying temperature over 5,relative humidity below 80%.

7. When construction is completed after 48 hours, it can tread. It must be maintained after 10 days for applying.

8. It ought to deposit in shady ,cool and desiccation storeroom. The stockpile time is one years.

we have good price for your reference

Antistatic Industrial Floor Paint, ZBH-4 Antistatic Industrial Floor Paint, ZBH-4

Send your message to this supplier
« Prev Product ... 8 9 10 11 12 13 14 ... Next Product »

Other Products from this Supplier

Company Info

Changzhou Zhongbang Chemical Group Co., Ltd.
[China]
[Verified Member]

City: Changzhou
Province/State: Jiangsu
Country/Region : China

Business Type:Manufacturer, Trading Company, Agent

View Contact Details

Email this page Bookmark this page Print this Page